• home
  • company
  • services
  • projects
  • contacts



    Projects


  • In preparation to raise the roof top unit, the street was closed and the crane was stationed on the road.
    Download Original
    In preparation to raise the roof top unit, the street was closed and the crane was stationed on the road.
  • 30 ton roof top unit raised 7 stories high by the crane.
    Download Original
    30 ton roof top unit raised 7 stories high
  • 30 ton roof top unit raised 7 stories high by the crane.
    Download Original
    30 ton roof top unit raised 7 stories high
  • 30 ton roof top unit raised 7 stories high by the crane.
    Download Original
    Roof top unit raised
  • Preparing structual support for the 30 ton roof top unit.
    Download Original
    Preparing structual support for the 30 ton roof top unit
  • 30 ton roof top unit raised 7 stories high by the crane.
    Download Original
    30 ton roof top unit raised 7 stories high
  • Final and complete installation of the roof top unit.
    Download Original
    Final and complete installation of the roof top unit.
  • GreenVerse HVAC Systems Inc © 2014